DIG IT Civil were contracted by Bellevarde Constructions to carry out earthworks on this steep waterfront site in Point Piper. This was done in two stages. As there was no easy site access from the road, all machines and materials had to be barged and craned in and out. Click here to see this job in action.

Stage 1 saw us demolish the existing four storey brick and concrete built house. Bulk and detailed excavation then took place for the construction of a new residential property and swimming pool. These earthworks saw us remove 2000m3 of sand and rock from site.

Stage 2 comprised of excavation for a lift from street level down to the house, approximately 20 metres down. This saw a total of 500m3 of rock excavated and craned off site. 

 
 
 
 
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper
  • Point Piper